Task | Optimistic (O) | Most Likely (M) | Pessimistic (P) | Distribution | Expected Value (E) | Standard Deviation (SD) |
---|---|---|---|---|---|---|
Total |
Total Project Expected Value: N/A
Total Project Standard Deviation: N/A
Coefficient of Variation (CV): N/A
P80 (80th Percentile Cost): N/A
P90 (90th Percentile Cost): N/A
P95 (95th Percentile Cost): N/A
Cost Range | Frequency |
---|
Simulated Mean Cost: N/A
Simulated Standard Deviation: N/A